A distinctive facade project in London, Golders Green Synagogue features Aerolite Stonework supported on the TI-DF2 kerf system, alongside split face Total Stone supported on the TI-DF4 undercut anchor system. The combination of materials and support systems helps create a facade that balances strong visual character with technical performance, giving the building a durable and well-defined external finish.
With a project size of 200m²+, the scheme highlights how contrasting stone finishes can be used to add depth and interest to the facade while still maintaining a clean and cohesive overall appearance. The project was delivered with My Construction Ltd as main contractor and M&M Contracts Ltd as installation contractor, bringing together the design and technical elements needed for a high-quality result.
A key feature of the project is the use of complex pre-formed corner panels in Aerolite Stonework, paired with the textured split face finish of Total Stone. This combination gives the facade a more detailed and distinctive look, while also demonstrating the flexibility of the chosen systems across a more specialist architectural application.