Architect: BDP

Main Contractor: Laing O’Rourke

Installer: Central Roofing (South Wales) Ltd

Material & m2: Engineered Ston, beige silk, 600m2. For more information, please visit www.tilesint.co.uk.

This new hospital marks a major investment of £38million by the Welsh Assembly Government for Hywel Dda University Health Board.

BDP architects were in charge of the project and designed this eye-catching façade with our lightweight engineered ston panels, stretcher bonded with random coursing heights.

Eternal corners were pre-formed, filled and dressed to achieve the solid stone appearance that was desired.